Delivery of 63.6k BC at COSCO Zhoushan
April 27, 2023Launching of 63.6k BC at COSCO (Zhoushan)
May 8, 2023Start Cutting of 35K Floating Dry Dock (NB045) in Gemak Shipyard Turkey
We are pleased to announce that on 02 May 2023 at h 16.25 (GMT+3h) the project 35K Floating Dry Dock (Construction NB045) had achieved first fabrication milestone “Start Cutting” in Gemak Shipyard (NETA Factory) – Turkey.
This is one of the biggest Dry Dock built under SMC Supervision with following characteristics:
Length overall: 253.5 m
Width overall: 54.5 m
Utile Width: 41.0 m
Draft max: 18.3 m
Capacity: 35,000 LT @ 18″ FREEBOARD
Structural Capacity: 85LT/FT in CL
Gross Tonnage: 16500 LT
Class: American Bureau of Shipping (ABS)
and having following milestone date
Steel Cutting: 2023-May-02
Keel Laying: 2023-August-16
Launching: 2024-July-13
Delivery: 2024-November-21
There are some representative pictures from the amended event.