Launching and Naming Ceremony of MV “INTERLINK PROBITY”
August 1, 2015Steel Cutting of No. B310
August 5, 2015Delivery of mv “Sti Lombard”
SMC is pleased to report Delivery in DSME/Daehan Shipyard, Korea: of mv ”Sti Lombard”, Hull No. 5403, the fourth unit from the series of 4 x 114,900 DWT Crude oil/ Product tankers ordered by Prime Tanker Management Inc., Greece.
Vessel’s principal particulars: LOA = 255.9m, B = 43.0m, D = 21.2m, T d/s = 13.6/15.1m. Propelled by MAN B&W 6G60ME-C9.2 with Energy saving rudder bulb and developing 9,100 KW x 71.9 rpm at NCR the vessel will operate at the speed of 14.5 knots. All vessels in the series are classed by DNV-GL and will be built to Marshall Islands flag requirements.
Classification notes: +1A1 Tanker for Oil ESP, CSR, SPM, BIS, TMON, BWM-E(s), BWM-T, CLEAN, E0, VCS-2, Recyclable, COAT-PSPC(B-C), ECA(SOx-A), OPP-F.