Steel Cutting Ceremony of M/V ”Interlink Cilvility”
6월 10, 2015Delivery of mv “Celtic Gas”, Hull No. S4025
6월 19, 2015Steel Cutting of MV “Tribini Tin Hau”, Hull No. 691
SMC is pleased to report Steel Cutting Ceremony in Zhejiang Ouhua Shipbuilding Co., Ltd, China: of mv ”Tribini Tin Hau”, Hull No. 691, the first unit from the series of 2 x 2700 TEU Container Vessel ordered by Skelby Shipping Limited.
Vessel’s principal particulars: LOA = 186.25m, B = 33.20m, D = 17.90m, T d/freeboard = 8.50/11.0m. Propelled by HHM main engine 6G60ME – C9.2 Tier II, with EGB tuning method and developing when SMRC – 12,200 KW x 85.0 rpm and when NCR (90% SMRC) – 10980 kW. The vessel will operate:
– at the service speed of 18.3 knots (when Tdesign, NCR).
– at the operation speed of 17.7 knots (when Tdesign, 80% SMCR).
– at the ECO speed of 17 knots (when Tdesidn, 71% SMCR) .
All vessels in the series are classed by Germanischer Lloyd and will be built to Hong Kong flag requirements.
Classification notes: GL+100 A5 CONTAINER SHIP, IW, BWM(D1&D2), DG, ERS, LC +MC AUT, EP-D, CM-PS.
Delivery of the vessel is scheduled for 16th June 2016.