• English
    • 中文 (中国)
    • 日本語
    • 한국어
SMC-logo-website(1)SMC-logo-website(1)SMC-logo-website(1)SMC-logo-website(1)
  • 公司简介
    • 公司简介
    • 愿景和使命
    • 质量管理体系与公司政策
    • 我们的团队
    • 贝仕集团
    • 公司宣传页
  • 我们的服务
    • 新造船及改装船服务
    • 船队技术支持
    • 压载水处理系统安装
    • 洗涤塔改装
    • 浮船坞采购服务
  • 服务项目
    • 当前项目
    • 业绩记录
    • 合作船厂
    • 我们的客户
  • 加入 SMC
  • 新闻中心
    • SMC 新闻
    • SMC 视频
    • BSM Highlights
  • 联系我们
✕
Honorary certificate for SMC site team issued by SWS
8月 16, 2017
Delivery of SPIL HAYU
8月 29, 2017

Steel cutting of 70,000 LT FDD in BSIC

8月 25, 2017

SMC is pleased to report Steel cutting in BSIC Shipyard, Qingdao, China of Hull No. FDD70K-01, 1 x 70.000 long ton Floating Dry dock, ordered by Huntington Ingalls Incorporated, USA.

The dock is designed by HEGER USA, who specialize in design of dry docks, with a lifting capacity 70,000 long ton and consists of 3 sections. The dock has been fitted with 20 high capacity de-watering submerged electric pumps which limits dewatering time to 180 minutes with a 70,000 LT vessel on dock. The time required to flood the dock to maximum submergence is 180 minutes with a 70,000 LT vessel on dock and the time required to transfer a 60,000 LT vessel from shore on to the dock is 120 minutes. Two on-board diesel generators provide the primary source of electric power, with a seperate shore side electric power connections while dry dock at shore and generators are not operating. Major machinery and equipment are in port side wing and a wing wall crane on wing deck. The starboard side wings are removable to allow launching and retrieving the docked vessel.

The Floating Dry Dock is classed by ABS. The delivery has been scheduled to carry out on 15 March 2019 and it will be transported by a heavy lift carrier from China to Pascagoula, Mississippi, USA.

 
 

© 2019 Schulte Marine Concept. All Rights Reserved. | Cookie Policy | Privacy Notice

    Languages
      • English
      • 中文 (中国)
      • 日本語
      • 한국어
      • English
      • 中文 (中国)
      • 日本語
      • 한국어