Steel Cutting Ceremony of M/V ”Interlink Cilvility”
10 6 月, 2015Delivery of mv “Celtic Gas”, Hull No. S4025
19 6 月, 2015Steel Cutting of MV “Tribini Tin Hau”, Hull No. 691
SMC is pleased to report Steel Cutting Ceremony in Zhejiang Ouhua Shipbuilding Co., Ltd, China: of mv ”Tribini Tin Hau”, Hull No. 691, the first unit from the series of 2 x 2700 TEU Container Vessel ordered by Skelby Shipping Limited.
Vessel’s principal particulars: LOA = 186.25m, B = 33.20m, D = 17.90m, T d/freeboard = 8.50/11.0m. Propelled by HHM main engine 6G60ME – C9.2 Tier II, with EGB tuning method and developing when SMRC – 12,200 KW x 85.0 rpm and when NCR (90% SMRC) – 10980 kW. The vessel will operate:
– at the service speed of 18.3 knots (when Tdesign, NCR).
– at the operation speed of 17.7 knots (when Tdesign, 80% SMCR).
– at the ECO speed of 17 knots (when Tdesidn, 71% SMCR) .
All vessels in the series are classed by Germanischer Lloyd and will be built to Hong Kong flag requirements.
Classification notes: GL+100 A5 CONTAINER SHIP, IW, BWM(D1&D2), DG, ERS, LC +MC AUT, EP-D, CM-PS.
Delivery of the vessel is scheduled for 16th June 2016.