Delivery of 63.6k BC at COSCO Zhoushan
27 4 月, 2023Launching of 63.6k BC at COSCO (Zhoushan)
8 5 月, 2023Start Cutting of 35K Floating Dry Dock (NB045) in Gemak Shipyard Turkey
We are pleased to announce that on 02 May 2023 at h 16.25 (GMT+3h) the project 35K Floating Dry Dock (Construction NB045) had achieved first fabrication milestone “Start Cutting” in Gemak Shipyard (NETA Factory) – Turkey.
This is one of the biggest Dry Dock built under SMC Supervision with following characteristics:
Length overall: 253.5 m
Width overall: 54.5 m
Utile Width: 41.0 m
Draft max: 18.3 m
Capacity: 35,000 LT @ 18″ FREEBOARD
Structural Capacity: 85LT/FT in CL
Gross Tonnage: 16500 LT
Class: American Bureau of Shipping (ABS)
and having following milestone date
Steel Cutting: 2023-May-02
Keel Laying: 2023-August-16
Launching: 2024-July-13
Delivery: 2024-November-21
There are some representative pictures from the amended event.