• English
    • 中文 (中国)
    • 日本語
    • 한국어
SMC-logo-website(1)SMC-logo-website(1)SMC-logo-website(1)SMC-logo-website(1)
  • COMPANY
    • Profile
    • Vision & Mission
    • Policies
    • Our Team
    • Schulte Group
    • Bernhard Schulte Shipmanagement
    • Corporate Leaflet
  • SERVICES
    • Newbuilding & Conversion Projects
    • Fleet in Service Support
    • Ballast Water Treatment System Retrofit
    • Scrubber Retrofit
    • FDD ACQUISITION SERVICES
  • PROJECTS
    • Current Projects
    • Track Record
    • Shipyard Experience
    • Client List
  • VACANCIES
  • NEWS
    • SMC News
    • SMC Videos
    • Highlights
  • CONTACTS
    • Contacts
✕
Delivery of mv “Sti Lombard”
August 3, 2015
Keel Laying of Hull No. H2532
August 12, 2015

Steel Cutting of No. B310

August 5, 2015

Crist Shipyard Gdynia in Poland: steel cutting ceremony of Hull No. B310, the second steel cutting for the series of 2 x 3,200 DWT Service Offshore Vessel ordered by Bernhard Schulte with following principal particulars: LOA = 88.0m, LBP=73.00, B (MLD) = 18.00m, Depth (from MD) = 8.00m, D s/d =6.4/6.0m.
The vessel designed in Ulstein SY as Offshore Wind Farm Service Vessel, will arranged for totally 60 person on board (POB), with storage, workshops, meeting rooms, cinema. Service speed of 13.5 knots propelled by 2 Azimuth units, each one driven by a frequency controlled electrical motor. Vessel will be equipped with 2 tunnel thrusters and one retractable Azimuth thruster on for part of vessel. FMEA-analysis for DP 2 approved by IMCA members.
All vessels in the series are classed by DNV and will be built to Gibraltar flag. Classification notes: DnV 1A1, SF, E0, Offshore service vessel, DYNPOS AUTR, CLEAN DESIGN, COMF-V (3)C(3), DK(+), BIS, NAUT-AW. LCS-DC, BMW-T, HELDK.

 
 

© 2019 Schulte Marine Concept. All Rights Reserved. | Cookie Policy | Privacy Notice

    Languages
      • English
      • 中文 (中国)
      • 日本語
      • 한국어
      • English
      • 中文 (中国)
      • 日本語
      • 한국어