• English
    • 中文 (中国)
    • 日本語
    • 한국어
SMC-logo-website(1)SMC-logo-website(1)SMC-logo-website(1)SMC-logo-website(1)
  • COMPANY
    • Profile
    • Vision & Mission
    • Policies
    • Our Team
    • Schulte Group
    • Bernhard Schulte Shipmanagement
    • Corporate Leaflet
  • SERVICES
    • Newbuilding & Conversion Projects
    • Fleet in Service Support
    • Ballast Water Treatment System Retrofit
    • Scrubber Retrofit
    • FDD ACQUISITION SERVICES
  • PROJECTS
    • Current Projects
    • Track Record
    • Shipyard Experience
    • Client List
  • VACANCIES
  • NEWS
    • SMC News
    • SMC Videos
    • Highlights
  • CONTACTS
    • Contacts
✕
Naming Ceremony of MV ”INTERLINK ABILITY”
April 20, 2015
Repair work for Collision damage of MV “ AENEAS”
April 28, 2015

Steel Cutting Ceremony of Hull No. NB-309

April 20, 2015

SMC is pleased to report Steel Cutting Ceremony in Crist SA (Contractor of Ulstein Verft), Gdynia, Poland for Hull No. NB-309, the 1st unit from the series of 2 x SX175 Service Operation Vessel (SOV), an Ulstein X-Bow design ordered by Windea Offshore.
Vessel’s principal particulars: LOA = 88.0m, B = 18.0m, D = 8.0m, T d/s = 6.0/6.4m. Propelled by 2(two) Azimuth type propellers driven by frequency controlled electric motors together with 2(two) Bow Thrusters & 1(one) retractable Azimuth Thruster the vessel will operate at the speed of 13.5 knots at 5.0m draught & 12.5 knots at 6.0m draught. All vessels in the series are classed by DNV-GL and will be built to Gibraltar flag requirements.
Classification notes: DNV +1A1 SF, E0, Offshore service vessel, DYNPOS AUTR, CLEAN DESIGN, COMF-V (3)C(3), DK(+), BIS, NAUT-AW. LCS-DC, BWM-T, HELDK.
Delivery of the vessel is scheduled for middle of 2016.

 
 

© 2019 Schulte Marine Concept. All Rights Reserved. | Cookie Policy | Privacy Notice

    Languages
      • English
      • 中文 (中国)
      • 日本語
      • 한국어
      • English
      • 中文 (中国)
      • 日本語
      • 한국어