• English
    • 中文 (中国)
    • 日本語
    • 한국어
SMC-logo-website(1)SMC-logo-website(1)SMC-logo-website(1)SMC-logo-website(1)
  • COMPANY
    • Profile
    • Vision & Mission
    • Policies
    • Our Team
    • Schulte Group
    • Bernhard Schulte Shipmanagement
    • Corporate Leaflet
  • SERVICES
    • Newbuilding & Conversion Projects
    • Fleet in Service Support
    • Ballast Water Treatment System Retrofit
    • Scrubber Retrofit
    • FDD ACQUISITION SERVICES
  • PROJECTS
    • Current Projects
    • Track Record
    • Shipyard Experience
    • Client List
  • VACANCIES
  • NEWS
    • SMC News
    • SMC Videos
    • Highlights
  • CONTACTS
    • Contacts
✕
Launching of Hull No. S5082
March 22, 2016
Delivery of ” INTERLINK VERACITY”
April 6, 2016

Launching Ceremony of Hull No. GWS487

March 31, 2016

SMC is pleased to report Launching Ceremony in Guangzhou Wenchong Shipyard of Hull No. GWS487, the 2nd 1,700 TEU Container Vessel ordered by CSSC (Hong Kong) Shipping Company Limited. Vessel’s principal particulars: LOA = 172.0m, B = 27.4m, D = 13.8m, T d/s = 8.5/9.5m. Propelled by Wartsila 6RT-flex58T-E Tier II with low load tuning and developing 12,204 kW x 101.4 r/min @ CSR. The vessel will operate at the speed of 19.65 knots at the designed draft of 8.50 m. The vessel is classed by Germanischer Lloyd and will be built to Singapore flag requirements.
Classification notes: +100A5 Container Ship, DG, BWM(D2), RSD, IW, NAV, EP-D, LC MC, AUT.
Vessel is scheduled for delivery on June 28, 2016.

 
 

© 2019 Schulte Marine Concept. All Rights Reserved. | Cookie Policy | Privacy Notice

    Languages
      • English
      • 中文 (中国)
      • 日本語
      • 한국어
      • English
      • 中文 (中国)
      • 日本語
      • 한국어