• English
    • 中文 (中国)
    • 日本語
    • 한국어
SMC-logo-website(1)SMC-logo-website(1)SMC-logo-website(1)SMC-logo-website(1)
  • COMPANY
    • Profile
    • Vision & Mission
    • Policies
    • Our Team
    • Schulte Group
    • Bernhard Schulte Shipmanagement
    • Corporate Leaflet
  • SERVICES
    • Newbuilding & Conversion Projects
    • Fleet in Service Support
    • Ballast Water Treatment System Retrofit
    • Scrubber Retrofit
    • FDD ACQUISITION SERVICES
  • PROJECTS
    • Current Projects
    • Track Record
    • Shipyard Experience
    • Client List
  • VACANCIES
  • NEWS
    • SMC News
    • SMC Videos
    • Highlights
  • CONTACTS
    • Contacts
✕
Launching Ceremony of Hull No. GWS487
March 31, 2016
Launching of Hull No. 309
April 26, 2016

Delivery of ” INTERLINK VERACITY”

April 6, 2016

SMC is pleased to report Ship Delivery in M/s. Taizhou Kouan Shipbuilding Co. Ltd, China: of mv ” INTERLINK VERACITY”, Hull No. TK1014, the seventh unit from the series of 15 X GREEN DOLPHIN 38,800 DWT Bulk Carriers ordered by Marine Capital Corporation, Bermuda.
Vessel’s principal particulars: LOA = 180.0 m, B = 32.0 m, D = 15.0 m, T d/s = 9.5/10.5 m. Propelled by MAN 5S50ME-B9.3 Tier II engine and developing 4575 KW x 89.9 rpm at CSR the vessel will operate at the speed of 14 knots at 9.50 draft. All vessels in the series are classed by Lloyd’s Register and will be built to Marshall Islands flag requirements.
Classification notes: LR +100A1 Bulk Carrier, CSR, BC-A, Hold Nos. 2, 4 may be empty, Grab [20], ESP, Ship Right (CM, ACS(B,D)), *IWS, LI, ECO(P, BWT, EEDI, IHM), Ice Class 1C FS. + LMC, UMS; With Descriptive notes: Ship Right ((BWMP (F,T), SCM, SERS).
The construction commenced with Steel Cutting on 15th April 2014 followed by the erection starting in slipway on 19th Sept 2015. The Ship launched on 14th Nov 2015 and the sea trial completed successfully on 29th Jan 2016. BSM, HK took delivery of ship after Delivery Signing Ceremony on 06th Apr 2016 which is attended by Class Surveyors, SMC Site Team and Shipyard representatives.”
The ship is scheduled to sail out from shipyard on 08th Apr 2016.

 
 

© 2019 Schulte Marine Concept. All Rights Reserved. | Cookie Policy | Privacy Notice

    Languages
      • English
      • 中文 (中国)
      • 日本語
      • 한국어
      • English
      • 中文 (中国)
      • 日本語
      • 한국어